batshonnicole
batshonnicole batshonnicole
  • 02-01-2019
  • Mathematics
contestada

Six people paint the fence and 15 hours how long would it take five workers to do the same job

Respuesta :

somaiasult2006
somaiasult2006 somaiasult2006
  • 02-01-2019
it will take 12.5 hrs for five workers to do the same job.


steps:

15 × 5 = 75

75 ÷ 6 = 12.5
Answer Link

Otras preguntas

One of the legs of a right triangle is twice as long as the other, and the perimeter of the triangle is 28. Find the length of the hypotenuse. In a right triang
3 6 9 1 12 15 1 18 1 21 Question 1 (1 point) No aceptar Orechazar Osoñar Osoportar O pasarlo bien Question 2 (1 point) ¿Cómo se dice en español? permissive A/ Q
Read the newspaper article, and then answer the question that follows. how does the article describe hiram revels? as embarrassed as abusive as dignified
Answer with an algebraic equation too!! Four years from now the combined ages of a set of twins will be 50. How old are they now?
what forces are acting on the book?
What value of g makes the equation true? 0.25 (g+1.5) = 2 • -1 • 2 • 6.5 • 9.5
If the inside of a container has a surface area of 20cm², what will be the pressure on each square inch of the container if 117.6kg of force are applied to the
Find slope and intercept of the line 3x - 2y - 7 = 0
Hereditary information is stored inside the
How were Japan's actions before and during World War II similar to Germany's actions over the same period?