dannyd2310
dannyd2310 dannyd2310
  • 02-04-2019
  • Computers and Technology
contestada

Why is the monitoring and controlling phase extremely important to the success of the project

Respuesta :

zdgzr
zdgzr zdgzr
  • 22-01-2020

Answer: It is the only way to ensure that work plan estimates are on track and that early intervention can take place.

Explanation: APEX

Answer Link

Otras preguntas

I need help. The two answers I got wasn't right. Explain how you got your answers.
what is your interpretation of a stanza​
A six-cylinder, four-stroke, 3.2-L compression-ignition engine operates on the ideal diesel cycle with a compression ratio of 19. The air is at 95 kPa and 67 de
Which factor can boost business opportunities in Virginia?
What would be the consequences if we did not have financial statements?​
(10) Jasmine uses 14.24 pounds of fruit for 16 servings of fruit salad. If each serving contains the same amount of fruit, how much fruit is in each serving?
A business jet of mass 40000 kg takes off when the thrust for each of two engines is 24000 N . Part A Find its acceleration. Express your answer to two signific
Given a bag of 20 marbles containing 8 green, 4 red, 2 blue, and 6 yellow, of a person picks out a single marble from the bag without looking, what is the proba
Which of the following is one of the most effective actions you can take as an eco-driver A avoid unnecessary idling B drive with the windows down C don’t drive
Compare solving multi step inequalities and solving multi step equations