Ibbythe8356 Ibbythe8356
  • 04-05-2019
  • Social Studies
contestada

When planning your week the first thing to consider about each activity that your scheduling is its priority level?

Respuesta :

RyleeCanaan12 RyleeCanaan12
  • 04-05-2019

Answer:

yes

Explanation:

i think that if you are going to get things done, than you need to think about how important they are. if something is needed in two weeks, you can save that for later. if something is needed in two or three days, i would do that first. different people have different ways of planning, but that is my opinion

Answer Link

Otras preguntas

on sara's computer, 3/8 of the hard drive is files. Of the files, 1/6 are games . What part of the hard drive is games?
A light plane flew from its home base to an airport 255 miles away. With a head wind, the trip took 1.7 hours. The return trip with a tail wind took 1.5 h
10u + 7 = 8 ( 2u - 4 ) - 9
what are three ways water erodes the surface of earth
what are three ways water erodes the surface of earth
10u + 7 = 8 ( 2u - 4 ) - 9
2 ( 4a - 12 ) + 3a = 6a + 1
two methods of active transport
on sara's computer, 3/8 of the hard drive is files. Of the files, 1/6 are games . What part of the hard drive is games?
Your model locomotive is 18 inches long. It is an exact model of a locomotive that is 72 feet long. A window on the locomotive is how many times wider than a wi