​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

Shawna has 3 adults 2 children coming over for dessert. she going to serve 2 small apple pies. if she plans to give each person, including herself,an equal amou
Order from greatest to least 2.007; 2.714; 2.09; 2.97
how many times does 96 go into 195
How do you put Shays' Rebellion in a sentence?
How many atoms does a molecule of sodium chloride contain?
what is the greatest common factors of 12 and 27
how does 0.008 compare to 0.08?
how can a levee help prevent flooding
1. In "In the Shadow of War", Omovo follows the soldiers and the women most likely because he (1 point) A. Yields to the curious whims of boys his age B. hopes
During the early stages of meiosis, two chromosomes in a homologous pair may exchange segments, producing genetic variation in sex cells. This process of exchan