kimbrachantel2962 kimbrachantel2962
  • 03-03-2020
  • Computers and Technology
contestada

The transition from ____ is initiated by the Job Scheduler according to some predefined policy. At this point, the availability of enough main memory and any requested devices is checked.

Respuesta :

isaacoranseola
isaacoranseola isaacoranseola
  • 04-03-2020

Answer: Hold to ready

Explanation:

This is when the process is waiting to be assigned to a processor. And this is carried out by the short term scheduler, so it can run. This state is immediately after the new state for the process.

Answer Link

Otras preguntas

Write 0.725 as a fraction in its simplest form
Expand and Simplify a. 2(x+y)+3(x+y) b. 5(x+y)+2(5x-y) c. 5(x+y)+3(2x-y) d. 3(2c+d)-2(4p-3) e. 4(2p+2q)-3(2p-q)
First two lessons : £12.75 each lesson All other lessons : £20.00 Each lesson Leah has some lessons with Stan's driving school. The total cost of lessons is £30
The infinitive is the most versatile verb form because it can be used as
Work out 5/8−2/5 Give your answer in its simplest form.
Seven out of every 8 students surveyed owns a bike. The difference between the number of students who own a bike and those who do not is 72. How many students
Solve the system of equations. 5x+9y+9z=5 4x+9y+6z=10 2x+2y+5z=9 Answer choices: a. x=116, y=8,z=-21 b. x=82, y=-10, z=9 c. x=-116, y=28,z=37 d. x=6,y=-14,z=1
What is 7.3 billion divided by 7?
Unscramble pxnapd involving Algerba
The bag of peanuts shown is on sale for $9.30. the pep club wants to divide the larger bag into 3/4 pound bags to sell at football games. One bag is 5 pounds. h