swtnru9440 swtnru9440
  • 04-03-2020
  • Mathematics
contestada

company 2 charges 4600$ for the first 550 feet of fence and 29 for each additional feet.find the cost if company 2 completes the job the total fence is 660​

Respuesta :

perry24366
perry24366 perry24366
  • 04-03-2020

Answer:

I love you 6.78

Step-by-step explanation:

You have to love yourself

- 5x

-6 x 45

6.78

Answer Link

Otras preguntas

What gives each amino acid its unique characteristics?
A die is rolled 200 times with the following results. Outcome 1 2 3 4 5 6 Frequency 32 36 44 20 30 38 What is the experimental probability of rolling the given
Cancel multiply 7/22×11/14
What is the biological basis for assigning all human populations to a single species? explain why it is unlikely that a second human species could arise by clad
Alex is decorating a large box with pieces of ribbon. He needs 7 sections of ribbon with a length of yard. He is going to cut the 7 pieces from a roll of ribbo
summarize the three main acid and base theories for arrhenius
What does 789 mean on a ouija board that is glowing?
Write a real world problem for the equation x-100=40
What does it mean to say that a plant community provides ecosystem services? a.It increases NPP. b.It improves the ability of the abiotic environment to suppo
how do i solve 3 1/3 minus 2 3/4?