melanyperez890 melanyperez890
  • 02-11-2020
  • Mathematics
contestada

How much does programmer charge for a coding project that takes 6 hours?
A computer charges $45 an hour for coding projects plus start-up fee of $150

Respuesta :

25tristanme
25tristanme 25tristanme
  • 02-11-2020

Answer:

150 + 45h

Explanation:

Hope this helps.

Answer Link

Otras preguntas

What was the purpose of the War Production Board (WPB)?
Given PQRS ≌ BCDE, what is m∠D? A. 63° B. 90° C. 98° D. 109°
The manufacturing of silk fabrics, brocades, and gauzes for the elite was done by _____
What is the degree of comparison of the underlined adjective in the sentence? Mount Everest is the tallest mountain in the world. A. positive B. comparative C.
Jamal buys postcards of Washington, D.C., for $10.20, not including tax. Each postcard cost $0.85. How many postcards did Jamal buy? (giving 20 points to first
Compute the resistance in ohms of a lead block 15 cm long and 0.10 cm2 in cross-sectional area. (ρ = 2.2 x 10-5 ohm-cm)
why was the missuori compromise more successful at making people on bothb sides of the slavery issue happy than the compromise of 1850 or kansas nebraska act
tim is excited because he thnks he got a higher score on a math test than his younger sister Lila.. Tim scored41 over 50 on his math test and Lila scored 21/25
If a chihuahua weighs 5 pounds, how much ounces does he weigh
2.0 is???? times greater than 0.002