When multiple architects work on a construction plan, which section of a construction plan will help them keep track of when the changes are made and by whom?
A.
framing plan
B.
schedule
C.
title block
D.
bill of materials

Respuesta :

katusukibakugoisgod
katusukibakugoisgod katusukibakugoisgod
  • 07-12-2020

Answer:

I believe that it is . A. framing plan

Explanation:

But I am not certain But I do know that it IS NOT B..

Answer Link
ewachi101 ewachi101
  • 26-08-2021

Answer:

the answer is schedule!!!

Explanation:

Answer Link

Otras preguntas

Dimitri wants to measure the height of the palm tree. He lines himself up with the palm tree's shadow so that the tip of his shadow meets the tip of the palm t
PLEASE HELP WILL GIVE BRAINLIEST TO CORRECT ANSWER Which of the following would most likely be the topic of a Japanese cinquain? A.art B.love C.lakes D.friends
maria compared the slope of the function f(x)=(-6x-21) to the slope of the linear function that fits the values in the table below.x -4 -2
given FB || EC, find BC question number 1 and PLEASE HELP with question number solve for x
What is the difference between Provolone cheese and American Cheese? I need to know for my science project ASAP!!!!!!!
Tara makes 3030 cups of donut topping by mixing sugar and cinnamon. The ratio of sugar to cinnamon is 3:2. How much sugar did Tara use in the donut topping?
an intrusion of magma along a bedsing plane is called what
What benefits did sea trading have over land trade routes?
what was thomas paine's role in American revolution
Why was the American Revolution not accepted???? Give me two reasons why plzzz I will give 100 points