fosterjoseph5716 fosterjoseph5716
  • 02-05-2021
  • Mathematics
contestada

If six girls can finish sweeping the floor of a hall in 45mins,how long will the same work take ten girls to do

Respuesta :

cmckee660
cmckee660 cmckee660
  • 02-05-2021

Answer:

15 minutes i think

Step-by-step explanation:

45÷6=7.5

meaning 7.5 minutes per girl

so 4 girls would be 30 minutes of work

so 45-30=15

Answer Link

Otras preguntas

What frequency must a sound wave have in air to have the same wavelength as a 750 Hz sound wave in a platinum bar?
15 Pts. Will give brainliest if correct. Which of the following would not be considered a stage of speciation? interbreeding occurs populations are separated ge
If a DNA-binding protein reads a short stretch of DNA and detects the following second genetic code provided by the functional groups located on each base as H-
Calculate the internal energy (in J) of 86 mg of helium at a temperature of 0°C.
What was a result of industrialization during the 1800's
Explain the difference between the prefix and postfix forms of the increment operator.
Which linear inequality is represented by the graph? y > 2/3x – 2 y < 2/3x + 2 y > 2/3x + 1 y < 2/3x – 1
When the legal speed limit for the New York Thruway was increased from 55 mi/h to 65 mi/h, how much time was saved by a motorist who drove the 700 km between t
To the nearest square foot, how many square feet are there in an area of 4.4 square meters?
Twice the difference of a number and three is negative two. Find the number