Brainwash2010
Brainwash2010 Brainwash2010
  • 03-06-2021
  • Mathematics
contestada

12 men or 15 women can do a piece of work in 21 days find the number of days to complete the same work by 6 men and 10 women​

Respuesta :

LIYAH009
LIYAH009 LIYAH009
  • 03-06-2021
18 days required to complete same work by 6 men and 10 women.

Given: 12 men or 15 women can complete work in 21 days
To find: Days it takes to complete same work by 6 men and 10 women

Solution:
12 men = 15 women ⇒ 1 man
Men = women
Men =
15 women can finish the work by 21 days
6 men = women
6 men =
6 men and 10 women = =
women can finish the work= = 18 days.

Hope I helped have a good day
Answer Link

Otras preguntas

What country has the most powerful nuclear weapons.
Every communication act involves a what ?
In poetry, a stanza sometimes develops a single idea related to the main topic of a larger poem. Emerson and Whitman both follow this practice in structuring th
5(y + ⅖) = -13 May i pleas get help
what is 6.729 x 8.3 (show ur work thanks)
What inventions made it possible for europeans to explore the world?.
Which type of wave interaction is shown in the photo? with ISSN AN O A. Diffraction O B. Reflection O C. Refraction O D. AbsorptionI'm not sure what physical sc
Hideki was attending his fifth baseball game at Condor Stadium, where he had previously had a panic attack. He did not know if he would have a panic attack toda
Find two values for x that make the inequality true. -5x<2 giving brainliest answer quick
Team A scored three times as many points as Team B. Which team scored most points? If Team A scored n point, how many points did team B score?​