ginapogones6676 ginapogones6676
  • 02-07-2021
  • Business
contestada

A costing system that uses actual costs for direct materials and labor and predetermined overhead rates to apply overhead is called a(n)

Respuesta :

topeadeniran2 topeadeniran2
  • 07-07-2021

Answer: normal costing system

Explanation:

A costing system which uses the actual costs for direct materials and the labor and predetermined overhead rates to apply overhead is referred to as the normal costing system.

Normal costing system is the cost allocation method whereby cost is assigned to products which are based on the labor, materials, and the overhead which are used in their production.

Answer Link

Otras preguntas

Good 6 word memoir for maya angelou I know why the caged bird sings
Which characteristic do ferns have that mosses do not?
Write a function for the area A of a square given the perimeter P of the square.
Some medications slow a person's nervous system. These drugs are often labeled "may cause drowsiness". Explain why a person needs to know about this side effec
a baseball team has home games on Thursday and Saturday. the two teams together earn $4746.50 for the team. Thursdays game generates $53.50 less than Saturday's
What are the main causes for seasons on earth?
Does a rectangle have more sides or angles
Abag of cookies can be shared equally among 2, 3,4,5, or 6 friends. what is the least number of cookies the bag could have
7/8 minus 1/2 equals
use compatible numbers to estimate the quotient. 394.6÷9