15men can complete a piece of work in25days. how many men should be added to complete the same work in15days.​

Respuesta :

mhanifa
mhanifa mhanifa
  • 04-08-2021

Answer:

  • 10 men

Step-by-step explanation:

Amount of work done by 15 men is:

  • 15 men *25 day = 15*25 man*days

Same work can be done by 25 men, in 15 days, so 10 more men should be added.

Answer Link
abovejosh
abovejosh abovejosh
  • 04-08-2021
Answer: 10 men explanation: guy above me
Answer Link

Otras preguntas

Someone please help
In figure 2, O is the center of the circle and B is a point on the circle. In rectangle OABC, if OA-5 and OC -6, what is the area of the circle? A) 11 pie B) 2
If you apply ghe change below to the quadratic parent function f(x)=x2 what is the equation of the new function? Shift 1 unit right vertically stretch by a fact
A cover letter lists all of your previous employers. True False
Function of the motherboard
1.How do systems of non-linear equation represent real life situation?2.What are the differences between non-linear and linear systems of equations?
When asked to factor the x^2-121 a student gives the answer (x-11)(x-11) what is wron with this answer?
In a batch of 100 cell phones, there are, on average, 5 defective ones. if a random sample of 30 is selected, find the probability of having 2 defective phones.
The population of a local species of dragonfly can be found using an infinite geometric series where a1 = 42 and the common ratio is 3/4. Write the sum in sigma
A first number plus twice the second number is 7. Twice the first number plus the second totals 20. Find the number