nikolaungurian nikolaungurian
  • 03-03-2022
  • Mathematics
contestada


It takes 12 men 5 days to complete a job. Work out how many days it would take 3 men to complete the same job.

Respuesta :

Esther
Esther Esther
  • 03-03-2022

Answer:

20 days

Step-by-step explanation:

It takes 12 men 5 days to complete a job. Work out how many days it would take 3 men to complete the same job.

12 * 5 = 60

60/3 = 20

It will take 3 men 20 days to do the same job

Answer Link

Otras preguntas

What are the three ways in which voltage can be induced in a loop of wire?
a mailing container for posters is made from 87.4 square inches of cardboard the container is in the shape of a triangular prism the base of the prism is an equ
In an essay on study skills that uses this chart for support, which sentence provides the best concluding statement? A) Jetser scores well with or without prepa
I need help ASAP! Please! 20 points!
Keisha knows that 1 fourth= 0.25 , explain how she could use this fact to determine the decimal equivalent of 5/8
How and why did the anti colonial struggles in india and south africa differ?
Rising warm air transports thermal energy by
Part 1: A rope has one end tied to a vertical support. You hold the other end so that the rope is horizontal. If you move the end of the rope back and forth wit
X-intercept (__,__) Y-intercept (__,__)
(8CQ) Determine whether the series -5+25-125+... is convergent or divergent.