Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

During the State of the Union address, the president is required to report to
deal A is 2 large pizzas that cost 19.99 and each large pizza has diameter of 35 cm. Deal B is 3 medium pizza that cost 24.99 and each pizza has a diameter of 3
write an essay describing the tone Bradbury sets and analyzing how he creates the particular mood
Convert into p/q form a) 2.345 b. 6.2525… c. 0.132222….. plss answer fast!!
Prolonged exposure to stress can affect the body and work away
An element with partially filled P orbitals is called a ________?
simplify sqrt 244x + sqrt 36x - sqrt 25x
Katie also needs 4 fluid ounces of honey to make honey buns. The shortened form of fluid ounces is
I WILL GIVE BRAINLIEST! NEEDS TO BE 100% CORRECT THOU! Solve for x. 12(x+20)=372 Enter your answer in the box.
Mark borrowed $14.00 from his sister to buy a new CD. He then did some yard work for his neighbor and earned $30.00 . if he uses his yard work money to pay his